Skip to content

From Vision to Reality

McNeese Urgent Care Rendering 1 Lake Charles Urgent care 1

McNeese Urgent Care

LAKE CHARLES, LOUISIANA 
This 5,500 SF project was an extensive remodel of an existing bank to convert into a much-needed urgent care facility for Ochsner and McNeese. 
TheGarage Parking Exterior Cam1 121818 Before NA 200527 880 Edit Edit Edit After

The Garage Condominia & Apartments

NEW ORLEANS, LOUISIANA 
This unique project repurposed an existing 70-year old, 5-story cast-in-place former parking garage into luxury apartments, condos, and retail space.
ACDA SouthsideHS 1 Before 180109 28 After

Southside High School

YOUNGSVILLE, LOUISIANA 
This project consists of a 258,000 SF new construction high school. The new state-of-the-art high school, located on a 100 acre site off of Almonaster road, consists of three main areas, the center of which is a three-story classroom building.  The classroom building contains laboratories, a library, a dining facility, and collaboration spaces.  A single-story building to the east houses two gymnasiums and locker room areas.  To the west, a single-story theatre, band and rehearsal building resides.  
Exterior Rendering 1 Shell Geismar Wellness Channing Candies Photography 0820 Shell geismar Wellness

Shell Geismar Wellness Center

GEISMAR, LOUISIANA 
Completed in just over 14 months, the Shell Geismar Wellness Center project included a renovation to an existing pre-engineered metal building, with added structural steel and a new metal building. Site work included new concrete and asphalt paving, with sidewalks, landscaping, outdoor patio, and an added basketball court.
 
West Jeff Rendering West Jeff Reality 2

West Jefferson Medical Center

MARERRO, LOUISIANA 
The West Jefferson Medical Center Master Plan project includes expansion and renovation to the Marrero Campus to better serve patients, staff, and guests. The preliminary scopes in WJMC’s Strategic Facility Plan include South Wing Patient Tower expansion and renovations; Ambulatory Surgery Center additions and renovations; Surgical Department renovations; and Emergency Department renovations.  The project will provide new PACU, Cath Lab, and ORs, along with modernization of the existing ORs.  New emergency department exterior entries, trauma bays, and pediatric areas will also be included.
The project will be executed in phases in order to maintain full operations throughout construction.
 

Click edit button to change this text. Lorem ipsum dolor sit amet, consectetur adipiscing elit